TESTING
1.System specification LHS of the V life cycle
corresponds to the SYSTEM TESTING
2.Boundary value analysis and cause effect graphing are methods of BLACK BOX TESTING
3. Work products that undergoes reviews are SYSTEM DESIGN
4. Effective document used for verification is REVIEW
5. Verification is STATIC type of testing
6.Misunderstanding of what modules leads to FAULT
7. Aftr retesting if the defect fix is satisfactory then it is marked as
8. if major flaws occur toward the bottom of the program, this approch is advantegious BOTTOM UP APPROACH
9.DYNAMIC TESTING is process of evaluating system or structure or documentation
10. Unit testing also known as MODULE or COMPONENT TESTING
11. Form of functional testing BOUNDARY
12. incorrect comparision of variables is directed by:
integration testing
system testing
UAT
none ans none(chk)
13.UNIT TESTING is done by programmers and not by testers in validation phase.
14. In testing concept test plan should be SPORDIAC
15. A principle measure of the completeness of test is based on the no of test cases IMPLEMENTED
16. benefits of a review is :
1 certifying correctness
2 encouraging uniformity
3 finding defects
4 both a and b
Ans:both a and b
17. in V model of testing component desgin coresponds to
1)unit
2)alpa
3)integration
4)user acceptance
Ans:
18. the _____________ team is a group of individuals i.e.(author,moderator.reader.recorder.inspectoer)
1)walkthrough
2)inspection
3)review
4)testing
Ans:
19. At which stage of inspection process each inspector examines d work product to find defect?
Ans: Preparation
20. Defects can also be tracked by:
Ans:Excel sheets
1.System specification LHS of the V life cycle
corresponds to the SYSTEM TESTING
2.Boundary value analysis and cause effect graphing are methods of BLACK BOX TESTING
3. Work products that undergoes reviews are SYSTEM DESIGN
4. Effective document used for verification is REVIEW
5. Verification is STATIC type of testing
6.Misunderstanding of what modules leads to FAULT
7. Aftr retesting if the defect fix is satisfactory then it is marked as
8. if major flaws occur toward the bottom of the program, this approch is advantegious BOTTOM UP APPROACH
9.DYNAMIC TESTING is process of evaluating system or structure or documentation
10. Unit testing also known as MODULE or COMPONENT TESTING
11. Form of functional testing BOUNDARY
12. incorrect comparision of variables is directed by:
integration testing
system testing
UAT
none ans none(chk)
13.UNIT TESTING is done by programmers and not by testers in validation phase.
14. In testing concept test plan should be SPORDIAC
15. A principle measure of the completeness of test is based on the no of test cases IMPLEMENTED
16. benefits of a review is :
1 certifying correctness
2 encouraging uniformity
3 finding defects
4 both a and b
Ans:both a and b
17. in V model of testing component desgin coresponds to
1)unit
2)alpa
3)integration
4)user acceptance
Ans:
18. the _____________ team is a group of individuals i.e.(author,moderator.reader.recorder.inspectoer)
1)walkthrough
2)inspection
3)review
4)testing
Ans:
19. At which stage of inspection process each inspector examines d work product to find defect?
Ans: Preparation
20. Defects can also be tracked by:
Ans:Excel sheets
No comments:
Post a Comment